Blog
Classic On California
The exterior work is finishing up on this full gut with second story addition bungalow. A mix of siding styles creates interest. Because the original
Welcome To Winona – Update
The structural steel has been set and the masonry has begun on this third floor addition.
Reconstruction On Ridgeway
Pryor Construction has begun a 3rd floor reconstruction due to fire damage. This also includes the rebuilding of an existing back addition. We have begun framing on
Laundry Rooms
Laundry rooms are no longer in basement dungeons, two floors from the bedrooms. They now reflect the overall style of the home.
Welcome to Winona
Pryor Construction is building as third story masonry master bedroom suite with a large walk-in closet, wet bar and laundry. When complete there will also
Rebuild on Ridgeway
After fire damage: – The third floor is being reframed to meet the new building code -New floor structure, floor decking and roof structure and
Happenings On Hermitage
Thin brick veneer is being applied to the exterior of the addition that complements the older Chicago brick on the existing bungalow. When compete it
Happenings on Hermitage
The final touches are being finished. The stack stone tile has been completed. We have installed a custom bookcase and a custom metal side compartment
Blissful on Bosworth
The custom rack and cooling system has arrived form California and has installed. This wine room features a custom glass door that can be seen
Whimsy on Walton
Our custom made walnut wall panels have been installed in the library. This wall will feature a custom rail system to hang art.
Blissful On Bosworth
New siding is up. The darker shade of grey makes the porch more noticeable.
Classic on California
We have begun the framing for the second floor addition on a classic bungalow on California. The new floor joists and new roof begin to