Blog
![](https://pryorconstruction.com/wp-content/uploads/2021/05/image002_2-scaled-1.jpg)
Bathroom On Buena
Our clients were so happy with their first bathroom that they have asked us to do their second. This will feature custom cabinetry and the
![](https://pryorconstruction.com/wp-content/uploads/2021/04/IMG_1268.jpg)
Tile Sneak Peak
Just a quick look at some of our current customer’s tile selections being installed.
![](https://pryorconstruction.com/wp-content/uploads/2021/04/IMG_20200728_124715-scaled-1.jpg)
Custom Work
A peek at some of the custom work we have ordered and installed for our clients recently. Custom cabinets that make the best of wall
![](https://pryorconstruction.com/wp-content/uploads/2021/03/PXL_20210106_202151198-scaled-1.jpg)
Transformation On Troy
Pryor construction has started a full gut renovation of an existing masonry two flat with a frame addition. We have received our demo permit and
![](https://pryorconstruction.com/wp-content/uploads/2021/03/IMG_20201029_154205-scaled-1.jpg)
Vanities & Sinks
A sample of different vanities and sinks being installed in bathrooms at different job sites.
![](https://pryorconstruction.com/wp-content/uploads/2021/02/IMG_20201218_134428-scaled-1.jpg)
Classic On California
The final trim pieces have been installed and are ready for paint. The floor finishing is almost complete. The remodeled house is completely new but
![](https://pryorconstruction.com/wp-content/uploads/2021/02/IMG_20201218_140641-scaled-1.jpg)
Classic On California
Cabinets for the kitchen have been installed. Light green painted upper cabinets with neutral base cabinets were chosen. A nice gray lightly veined soapstone was
![](https://pryorconstruction.com/wp-content/uploads/2021/02/image001.jpg)
Happenings On Hermitage
The indoor spa has been tiled and plans are being pulled together for the surround and storage area for spa cover.
![](https://pryorconstruction.com/wp-content/uploads/2021/02/20201229_103254-1-scaled-1.jpg)
Classic On California
The exterior work is finishing up on this full gut with second story addition bungalow. A mix of siding styles creates interest. Because the original
![](https://pryorconstruction.com/wp-content/uploads/2020/11/IMG_20200927_120529-scaled-1.jpg)
Welcome To Winona – Update
The structural steel has been set and the masonry has begun on this third floor addition.
![](https://pryorconstruction.com/wp-content/uploads/2020/11/IMG_20201014_094439-scaled-1.jpg)
Reconstruction On Ridgeway
Pryor Construction has begun a 3rd floor reconstruction due to fire damage. This also includes the rebuilding of an existing back addition. We have begun framing on
![](https://pryorconstruction.com/wp-content/uploads/2020/11/DSCN1232-2.jpg)
Laundry Rooms
Laundry rooms are no longer in basement dungeons, two floors from the bedrooms. They now reflect the overall style of the home.