Blog
A Collaboration on Cortland – Framing and HVAC
The framing for the interior and the new addition has begun. The new ducts for the HVAC systems are going in as the framing is
Maximizing on McClurg
A finished full renovation of a two-bedroom/ three-bathroom condominium unit in Streeterville. This included new floors, a new kitchen, renovated bathrooms, and laundry in unit.
A Collaboration on Cortland – Excavation and Foundation
The excavation is complete. An additional twenty-seven inches will be added to the ceiling height of the existing basement and along with the new addition.
A Collaboration on Cortland
Pryor Construction has started a two-story rear addition including basement dig down and a third-floor balcony including garage with rooftop deck. The rear deck and
Makeover on Maplewood
Kitchen reno is coming to a close and the homeowners are making use of the space right away.
Change on Charleston Part 2
We have just complete a custom railing to a rooftop deck area.
Renewal On Ravenswood
After a long lead time and a train from California our client’s tub has finally arrived. The rough framing is finishing. The original floors had
Renewal On Ravenswood
We have just started the gut renovation of a bathroom. Many times after we finish the demo, we get a lot of surprises. This early
Custom Doors
There are occasions when renovating in Chicago that doors need to be made to match existing traditional turn of the century doors in a home.
Change on Charleston – Part 2
Move in day is approaching and the kitchen and bathroom are complete in the loft renovation. The kitchen features rift sawn white oak cabinets and