Blissful on Bosworth
The roof deck is nearing completion. This floating decking system by TileTech allows for an Ipe wood finish deck over an existing pitched flat roof. With the added glass railing system – it continues the view outward. This third story deck will feature an outdoor fireplace with TV lounging area.
Happenings On Hermitage
Things are finishing up on the second floor. Wall and trim painting are complete and light fixtures are being installed. After the floor protection has been removed, the finished look is revealed.
Happenings On Hermitage
The last of the plumbing fixtures are being installed in the second floor bathrooms and laundry room along with shower glass and lighting fixture choices.
Construction Access in The City November
One very important part of construction planning in the city is how to access to the job site. Materials and equipment must be able get into very tight spaces. Many interior staircases were built a century ago very narrow and with many turns. We many times have to build temporary stairs or hand dig jobs […]
Happenings On Hermitage
Framing is underway!
Modern Tub and Shower Installation – Ravenswood
We are installing an interesting architect designed tub and shower that embraces the typical Chicago roof pitches. Penny round tiles on walls, floor and ceiling, a niche and a custom window pull the look together.