Wrappings on Wrightwood
Rough inspections are now complete and the new addition has now been insulated. Drywall will begin to be installed.
Wrappings on Wrightwood
Pryor Construction is building a second story addition on a 1930’s bungalow. The new space has been framed, roofed and the new windows have been installed.
Happenings on Hermitage
Demolition is complete and excavation has begun on the rear of the home making way for the new addition.
Happenings on Hermitage
The new water service is being installed. The street opening and trenches have been dug ready for new pipe.
Conversions On Campbell
These are in progress pictures of one unit in this multi- unit renovation. The drywall, doors, trim, flooring and tile are being installed.
Launch on Larrabee
Our clients were looking to minimize the visual partitions in the small floor plan. We installed a piece of strong tempered glass with brushed chrome hangers.
A Change on Charleston
Move in day is coming and final details are being installed.
Hone In On Hoyne
Sharing some images from before move in day. Light fixtures are being installed and painting is finishing up.
Launch on Larrabee
Move in day is coming for this two bedroom townhouse project. Cabinets, tile and fixtures have been just been installed.
Modern Tub and Shower Installation – Ravenswood
We are installing an interesting architect designed tub and shower that embraces the typical Chicago roof pitches. Penny round tiles on walls, floor and ceiling, a niche and a custom window pull the look together.