Blog
Wimsey on Walton
September 4, 2019
The drywall and flooring is installed and the trim and tile have started.
Happenings on Hermitage
August 29, 2019
Our HVAC units are delivered by crane on to the job site.
Whimsy On Walton
July 20, 2019
Pryor Construction is currently renovating a 3000 SF condo on East Walton. This unit will feature three bedrooms, three bathrooms and a full custom paneled
Happenings On Hermitage
July 13, 2019
The addition is framed in and the house is taking shape.
Happenings On Hermitage – Concrete
May 22, 2019
We all love a beautiful day like today to pour some concrete!
Happenings On Hermitage
May 21, 2019
The concrete basement floor is being poured and the framing is moving along.