As the foundation and masonry work continues in the rear, carpenters have begun the rough framing of the new floor plan in the existing front portion of the house. This includes a new skylight and new stairs from the second floor to the basement. Floor joists have arrived to be installed.
![](https://pryorconstruction.com/wp-content/uploads/2016/12/5-e1485403143838-225x300.jpg)
![](https://pryorconstruction.com/wp-content/uploads/2016/12/IMG_1568-e1484894154771-225x300.jpg)