Blog
Moving On Medill
The basement continues to be dug out by hand. Soon it will be ready for rough plumbing.
Moving On Medill
We have finished demo on a basement dig down project that will feature a full basement build out to create lower level living space. Follow
Happenings On Hermitage
The excavation is complete and the concrete foundations have been poured awaiting inspection.
Makeover On Mozart
The finish work being completed on the kitchen on Mozart.
Wrappings on Wrightwood
Rough inspections are now complete and the new addition has now been insulated. Drywall will begin to be installed.
Wrappings on Wrightwood
Pryor Construction is building a second story addition on a 1930’s bungalow. The new space has been framed, roofed and the new windows have been
Happenings on Hermitage
Demolition is complete and excavation has begun on the rear of the home making way for the new addition.
Happenings on Hermitage
The new water service is being installed. The street opening and trenches have been dug ready for new pipe.
Conversions On Campbell
These are in progress pictures of one unit in this multi- unit renovation. The drywall, doors, trim, flooring and tile are being installed.
Launch on Larrabee
Our clients were looking to minimize the visual partitions in the small floor plan. We installed a piece of strong tempered glass with brushed chrome