May 21, 2019
The concrete basement floor is being poured and the framing is moving along.



Happenings On Hermitage
April 30, 2019
The custom spa pool we had fabricated in Utah has arrived and we are delivering it to the site by crane.


Finding Outdoor Storage Spaces
April 10, 2019
In the city storage space for yard equipment, outdoor furniture and kids toys is hard to find. Building access doors under porches create the perfect

Moving On Medill
March 26, 2019
The water service installation and inspections are now complete.

Moving On Medill
March 16, 2019
The basement continues to be dug out by hand. Soon it will be ready for rough plumbing.

Moving On Medill
March 9, 2019
We have finished demo on a basement dig down project that will feature a full basement build out to create lower level living space. Follow



Happenings On Hermitage
January 16, 2019
The excavation is complete and the concrete foundations have been poured awaiting inspection.