Blog
New on North Park – Keeping the character of old wood floors
For our project on North Park, we were hired to refinish existing turn of the century 3 ¼ pine flooring after removing small side walls
Blissful On Bosworth
The new addition is now framed out. When complete this new 3rd floor will feature an additional bedroom suite, bonus room, wine room and outdoor
Blissful on Bosworth
The roof is off and we are getting ready to start framing the upstairs addition.
Whimsy on Walton – Custom Metal Cabinets
Custom iron and glass cabinets have arrived from a fabricator in Arkansas. One large cabinet is mounted over a lower work station in a butlers
Blissful on Bosworth
New project. Pryor Construction will be adding a third floor addition to an existing single family home. Demolition has begun to prepare for the new
Happenings On Hermitage
Update – Drywall has been installed and flooring will start soon.
Letting The Daylight In
Our clients are choosing ways to let day light into their homes without sacrificing privacy. Operational skylights that automatically close when they sense rain and
Moving On Medill
At punch list the final details are coming together for this full 1100 square foot basement dig down. The heated floor includes porcelain tiles that
Happenings on Hermitage
All the windows have been installed, the new garage has been framed up and the backyard landscaping has started to be installed.
Happenings on Hermitage
Insulation has been blown in at all exterior walls to meet energy code.
Modifying on Maplewood
The new second story dormers are being framed out. Temporary framing has been built to hold up the existing roof.The new dormers will give much