Blog
New Look On Norwood – Kitchen
The kitchen cabinetry and appliances have been installed. The owner has selected contracting colors that enhance the kitchen layout. Storage was a high priority for

Hone in on Hoyne – Final Tile selections
Work is almost done and the moving day is right around the corner. For this project a variety of subway tiles were used for the

Hone In On Hoyne – Custom Work
A free standing cast iron tub was chosen by the home owners. The designer requested that it be painted a custom gray color to match

UPDATE: New Look On Norwood
The exterior of this home has gotten update. We have just finished installing new siding and trim to complement the existing yellow brick. This new

Pryor Construction Process
An important part of our process that we have found valuable is the weekly site meeting. One meeting a week allows for us to meet

Hone In On Hoyne: Historic Preservation
During this large project that included a full gut of the existing interior and building a rear addition special care has been given to protect

Hone In On Hoyne: Appliances
We are close to the finish line when the appliance package is delivered. Appliance packages are decided farther in advance than most people realize. The

Hone In On Hoyne: Tile
The tile choices have been made for all the bathrooms, floors and kitchen. They are now on site and are being installed. We are working

UPDATE: Hone In On Hoyne
The white oak floors have been installed and a stain color has been chosen. These pictures demonstrate how the same color floors look dramatically in
UPDATE: Hone In On Hoyne
White oak flooring has been chosen for this project. The wood has been on site to acclimate and installation as begun. The color of white
Keeping Character : Reproducing Crown Molding
One project we are working on requires the reproduction of plaster crown molding that was originally formed on site by an artisan over one hundred
Office On Montrose
We have updated our windows on Montrose Street. Renovation is a journey that requires a significant amount of thought, passion and energy. Our goal is