Happenings on Hermitage
Demolition is complete and excavation has begun on the rear of the home making way for the new addition.
Happenings on Hermitage
The new water service is being installed. The street opening and trenches have been dug ready for new pipe.
Conversions On Campbell
These are in progress pictures of one unit in this multi- unit renovation. The drywall, doors, trim, flooring and tile are being installed.
Launch on Larrabee
Our clients were looking to minimize the visual partitions in the small floor plan. We installed a piece of strong tempered glass with brushed chrome hangers.
A Change on Charleston
Move in day is coming and final details are being installed.
Hone In On Hoyne
Sharing some images from before move in day. Light fixtures are being installed and painting is finishing up.
Launch on Larrabee
Move in day is coming for this two bedroom townhouse project. Cabinets, tile and fixtures have been just been installed.
Modern Tub and Shower Installation – Ravenswood
We are installing an interesting architect designed tub and shower that embraces the typical Chicago roof pitches. Penny round tiles on walls, floor and ceiling, a niche and a custom window pull the look together.
Conversions On Campbell
All City rough inspections are complete and insulation has been installed. We are now beginning to drywall all four units.
A Change on Charelston
Pryor Construction has begun the complete renovation of a 1200 sf condo in Bucktown. The new design will feature a reconfigured and updated master bathroom and kitchen.